The pilot hole is the first step in the construction of trenchless engineering, followed by reaming. Managed jobs are based on this. Whether the quality of the guide hole, such as the turning radius of the deflection section, the smoothness of the trajectory curve, and the position of avoiding underground obstacles, is directly related to the success or failure of …