The construction process of horizontal directional drilling can generally be divided into three steps: pilot hole drilling, pre-expanding, and pipeline pulling back. The quality of the pilot hole trajectory directly affects the size of the pullback force, and the risk avoidance of directional crossing is largely reflected in the construction process of directional drilling. Therefore, only by mastering advanced steering …